Two Component Js Cementitious Waterproof Coating Polymer Cement

Color
Grey
Usage
Outdoor, Indoor
Method
Brush/Spray
Transport Package
Pallet
Specification
20kg/pail
Origin
China
We support our purchasers with ideal high-quality merchandise and significant level company. Becoming the specialist manufacturer in this sector, we now have received loaded practical encounter in producing and managing for Two Component Js Cementitious Waterproof Coating Polymer Cement, The product will supply to all over the world, such as: Swiss, Danish, Haiti, Furthermore, all of our items are manufactured with advanced equipment and strict QC procedures in order to ensure high quality. If you are interested in any of our goods, please don't hesitate to contact us. We will do our best to meet your needs.
Shenyang Jiuding Hongtai Construction Materials Co., Ltd. Diamond / Audited Supplier
JS Cementitious Waterproofing Coating

Description
Product is composed by two component (liquid and powder). The liquid component comes from the mixture of acrylic acid and silicon co-polymerization emulsion polymerization adding a variety of additives by foreign technology. The powder component is a kind of inorganic powder from the mixture of raw waterproof material. This is a new type of waterproof material with high flexibility, strength, water resistance.

Feature & Benefit
1.This product takes the acrylic acid and polymerization silicon co-polymerization emulsion as the latest tight vanguard technology to improve the ability of water resistance.
2. Take water as the dispersion medium,no-toxic,harmless to the environment.
3. Paint film have high elasticity and tensile strength,water resistant and weathering resistance.
4. Can be used in many kinds of basic plane,wet and dry basic plane both are suitable to construction.
5. Easy construction to reduce construction time.
Main Application
1. Surfaces  under  tiles  in  swimming  pools,  balconies,  rooms, bathrooms, kitchens
2. Shafts, water tanks (also potable water), silos
2. Underground surfaces of buildings, interior or exterior
4. Tunnels and motorway bridges
Installation
1. Mix the fluid and powder component together according to the percentage.
2. First put the liquid component in the barrel,then pour the powder and then mix two component by stirrer.
3. The first coat surface drying time is 4H, the temperature lower,the time longer.
4. When the first coat is dry,start the second coat until achieve the required thickness.
 
 

Technical Data Sheet
Implement Standard: GB/T23445-2009  
NO. Item Standard Result
1
 
Solid content,% ≥ ≥70 81
 
2 Flexibility at Low Temperature, No Crack, ф10mm Stick -10ºC,No Crack Pass
3 Water Impermeability, 0.3Mpa, 30min Impervious Pass
4 Retention tensile strength  MPa≥ ≥1.2 1.9
5 Elongation at break,%≥ ≥200 239
6 Adhesive Strength MPa≥ ≥0.5 0.8

Supply

Coverage

Recommended dosage: 2.5kg/m2·mm

Packaging

20kg/drum, or customized as required

Shelf life

The temperature from 5ºC to 40ºC, valid time is one and half a year.